Paid Fairly For Property Damage Inc.
Older buildings hide asbestos in flooring, pipe insulation, ceiling texture, siding, mastic, and roofing. Before your crew cuts, drills, or tears into any of it, get a lab-confirmed answer on exactly what is in the work area.
Who this is for
For a detached home or a small residential building, no state survey mandate forces this test. The reason to run it is simpler: an asbestos surprise in the middle of a job costs far more than the answer costs before it.
Your workers are your OSHA responsibility. Knowing what a material is before anyone disturbs it decides the controls, the crew, and whether the material gets touched at all.
A positive find changes the price, the scope, and the subcontractor list. Finding out at bid time protects the deal. Finding out mid-demo kills it.
Peace of mind with a paper trail. A documented lab result answers the question for your family, your contractor, and the next buyer of the house.
How it works
You will never be sold a second test after the first one. The full protocol is priced and authorized up front, and it runs until the material is answered.
We walk the exact areas your project will disturb and collect bulk samples of the suspect materials in that scope: floor tile and mastic, pipe and boiler insulation, ceiling texture, transite siding, roofing materials, and similar. Sample spots are patched and every location is photo-documented.
Samples go out under chain of custody to an NVLAP-accredited lab for PLM analysis, which identifies the asbestos type and percentage in each material.
PLM can miss fine fibers in materials like floor tile and mastic. Any suspect material that PLM reads negative inside your work scope is confirmed by TEM, the high-resolution method, under the same authorization. No second sell, no surprise invoice.
You get a written report with sample locations, photos, and lab results in plain language. If a material is positive, the report includes the next-step protocol for residential work or a referral to a licensed abatement contractor. If it is clear, your crew proceeds with a documented file.
Why the method matters
Cheap testing blurs these together. They are not the same test, and the difference is where wrong answers come from.
Counts fibers in air. It cannot tell asbestos from fiberglass or cellulose and cannot name a fiber type. It answers how many, never what.
The standard bulk material method. It identifies and types asbestos in a sample and estimates the percentage. Its blind spot is fine fibers in organically bound materials like tile and mastic.
The high-resolution confirmation method. It sees what PLM misses and confirms the fiber type. This is the referee when a suspect material reads negative and the job still has to proceed.
The fine print, up front
Detached single-family homes and residential buildings under 10 units in Maryland, DC, and Northern Virginia. Sampling is performed by a trained field technician (OSHA 521, Guide to Industrial Hygiene; EMSL-certified sampler). Every engagement is documented and reported under the DIRECT methodology: Evidence Before Opinion. If a file needs a CIH, we can bring one in.
Field work is led by Billie Walker, EPA Asbestos Supervisor accredited under TSCA Title II (Certification No. AS11022026-17) and Maryland MDE Asbestos Supervisor accredited November 20, 2026, who also serves as competent person on residential abatement work.
Schools and public or commercial buildings, including residential buildings of 10 or more units, sit inside Maryland's accreditation system, and inspections there must be performed by a Maryland-accredited asbestos inspector. If your project falls in that category, call us and we will tell you plainly what it requires instead of selling you the wrong service.
Pricing
Field and report time is billed at $350 per hour with a two-hour minimum. Lab fees are passed through at cost and are estimated and capped inside your quote, including TEM confirmation where the protocol calls for it. One number, agreed before the first sample is cut.
For a detached single-family home or a small residential building, Maryland does not mandate a pre-renovation asbestos survey the way it does for schools and commercial buildings. Contractors still carry federal OSHA duties to protect their own workers when suspect materials are disturbed, which is why most of our clients are contractors. The test is how you know, instead of guessing.
Any suspect material inside the area your project will disturb: vinyl floor tile and its mastic, pipe and boiler insulation, popcorn and textured ceilings, transite siding, roofing felt and shingles, duct wrap, and older joint compound. If the work will not touch it, it usually does not need a sample.
Standard lab turnaround is a few business days after the samples reach the lab. Rush analysis is available at the lab's rush rates and is quoted up front if your schedule needs it.
Work on that material stops. Your report lays out what was found and where, and for residential work we can write the handling protocol or refer you to a licensed abatement contractor. A positive result at the sampling stage is a planning problem. The same result discovered mid-demolition is a cleanup problem.
Maryland, Washington DC, and Northern Virginia.
Submit a property
Send the address, the year it was built, and what the project will disturb. You will get a written quote covering the full protocol before any work begins.